Wall blocks during the installation process are installed directly on each other, then temporarily fastened with ordinary polyurethane mounting foam. Reinforcing rods must be inserted as vertical and horizontal channels of blocks without passes.
Then the horizontal channels of the extreme blocks must be closed with mounting foam.
In the outer corners, blocks with a height of 76 cm are connected to the mustache, using the ending of the end edges at an angle of 45 °. The corner joints in this method of installation will be very neat and absolutely even. The corner blocks were cut with a disk saw, which was installed at an angle of 45 °.Initially, a drink was performed to a depth that allowed this to make the diameter of the disk, on one side of the block, and then – on the other, after which the cut was completed with a hand hacksaw.
In the window and door openings in the end edges of the extreme blocks, cuts were made over the entire height of the opening in such a way as to then set the bars with a cross section of 5×15 cm flush with the outer edge of the blocks. These bars will not allow the solution to leak out of horizontal canals between blocks during wall concreting, and later will be used to fasten window and door boxes, which can always be purchased directly at the production of metal doors.
Long bolts, which entered 38 cm in a step at the level of horizontal channels in the blocks, provided after pouring the solution a very strong connection of the embedded with the walls.
The pediments were first laid out to the full height, then they clearly marked the slope of the roof slope, and only after that they cut off all the extra protruding parts of the blocks with a hand chain saw.
The construction of walls, as well as filling blocks with a solution, is still desirable to perform in stages. The best solution is to fill in the solution when the walls are reached a height of 244 cm (design height of 1 story). This work needs to be done in two entry. At first, all hollow canals are poured with a solution only half of the entire height, alternately passing around the perimeter of all walls. After you, bypassing the entire first floor, will return to the starting point, the solution in this place will partially grasp, and you can continue the process of filling the channels to the top.