YourFlorida - fashion, travel, business, sport, real estate
  • News
  • Finance
  • The buildings
  • Business
  • Travel
  • Decor
  • Interior
  • News
  • Finance
  • The buildings
  • Business
  • Travel
  • Decor
  • Interior
No Result
View All Result
YourFlorida - fashion, travel, business, sport, real estate
No Result
View All Result

Than Canadian construction technology is better than traditional?

26.12.2017

School repair

Many people, planning to build a house, are puzzled by the question of how it is better to do it with the use of which technology? After all, it should be not only warm, cozy and comfortable, but, it is desirable that it does not require repairs as long as possible, without losing a presentable look.

The construction of country houses and cottages from bricks can turn out to be not only an expensive, but also a long project, as, indeed, from the beam and the galvanized log. Gas – and foam concrete is simply not everyone likes, but the Canadian house may be the perfect option.

Construction by Canadian technology will not take much time – only 1 to 5 months. Building a house from comfort house from Cendwich panels due to the readiness of factory materials is very simple. All elements of the house will be made at the factory, and the house itself will be assembled as a designer, of them.

Such panels take over the entire power load of the house due to the fact that they are a self -supporting.

Suppose you saw somewhere, or you yourself figured out what your perfect house should look like. Is it possible to create a project of such a house? Certainly. The project is created as much as possible, and after the factory the building designer is made at the factory. In the meantime, there is a process of manufacturing parts for your home – foundation work is carried out. You can dwell on a light column foundation, but if you want, you can choose and something more serious.

Когда на стройплощадку завозятся детали дома – счет начинает идти на дни. So, the walls of the first floor with all the ceilings and the attic can be collected in just 16 days. Well, the full process can take no more than 1.5 months.

The most pleasant surprise awaits you after the completion of construction: to carry out all the necessary communications, you will not have to hammer the walls. Why? All this is taken into account in the project even at the first stages of development, and water supply is carried out during the foundation device.

The reasonable completion of construction work will of course be the design of the interior of the house. But this is already exclusively your fantasy and wishes.

Previous Post

Features of the fold roof

Next Post

Metal structure in construction construction of cottages

Related Posts

News

Where to start registering a business in Florida USA

29.04.2024
News

How to Buy an Association Apartment in Florida

29.04.2024
News

Let’s talk about the climate of Florida and its features

28.04.2024
News

Modern design of industrial and commercial construction objects

20.03.2023
News

Reserve areas for the subsequent construction of buildings

13.02.2023
News

Modern types of air conditioners

13.01.2023
Next Post

Metal structure in construction construction of cottages

Popular

  • 3 types of tape piles for metal

    0 shares
    Share 0 Tweet 0
  • A dream can become a reality

    0 shares
    Share 0 Tweet 0
  • Mechanical characteristics and construction of foundations

    0 shares
    Share 0 Tweet 0
  • Modern design of industrial and commercial construction objects

    0 shares
    Share 0 Tweet 0
  • Compact systems

    0 shares
    Share 0 Tweet 0
  • Reserve areas for the subsequent construction of buildings

    0 shares
    Share 0 Tweet 0

Latest Posts

Where to start registering a business in Florida USA

29.04.2024

Florida Taxes: Features, Benefits and Rules

29.04.2024

How to Buy an Association Apartment in Florida

29.04.2024

What kind of entertainment and festivals are there in Florida?

28.04.2024

Fort Lauderdale: resort advantages and some facts

28.04.2024

Holidays in Miami: the best resorts in Florida

28.04.2024

Popular

3 types of tape piles for metal

04.04.2017

A dream can become a reality

02.11.2018

What's New

Where to start registering a business in Florida USA

29.04.2024

Florida Taxes: Features, Benefits and Rules

29.04.2024

Don't Miss

Installation of windows in a log house

09.12.2020

Roal from cement sandstone tiles

27.07.2017

Recommend

3 types of tape piles for metal

04.04.2017

A dream can become a reality

02.11.2018

© YourFloridafamily.com, 2015-2023. All Rights Reserved.

No Result
View All Result
  • News
  • Finance
  • The buildings
  • Business
  • Travel
  • Decor
  • Interior

© YourFloridafamily.com, 2015-2023. All Rights Reserved.